Below are some recent projects that we have undertaken.

Redditch Borough
Council

Project: Passive Fire Protection 2026-2029

Contract Value: £1.4M per annum for 3 years

Location: Redditch, Worcestershire

Astwoods are working in Partnership with Redditch Borough Council undertaking a major passive fire improvement programme to the authority’s 5700 homes. The works include the installation of communal fire doors, front entrance doors, improvements to fire compartmentation and fire stopping. Comprehensive resident liaison is being provided by Astwoods to ensure excellent customer satisfaction.

University Hospital Coventry & Warwickshire

Project: Passive Fire Upgrade Programme 2023-2026

Contract Value: £5M + 

Location: Coventry

Astwoods is the appointed Fire Door installation contractor for a significant upgrade programme of Fire Door Replacements spanning the acute hospital site. The contract is being undertaken on a supply & fit basis, and works are programmed to minimise disruption to patients, medical staff, and other building users. Astwoods liaise closely with the PFI team, the NHS Trust and various specialist consultants to deliver this project. Associated works are also completed, to include fire rated partitions, fire stopping, flooring, decoration, automation, fire alarms and security.

Wolverhampton
Homes

Project: Fire Door Replacements

Contract Value: £2.5M +

Location: Merry Hill – Wolverhampton

Providing the replacement of fire doors throughout three 15 storey towers in the Merry Hill area of the city. The works comprise the replacement of metal, composite and timber fire doors, and other associated carpentry and fit out works. Working closely with the residents, we are ensuring works are complete within one day. To communal areas Astwoods formed new fire rated riser cupboards to all floors throughout the blocks, new ceilings and replacement fire doors throughout.

Queen Elizabeth
Hospital

Project: Fire Door Replacement 2020-23

Location: Birmingham

Astwoods works alongside EQUANS in the supply and installation of new doorsets, and inspection of existing doors, throughout the NHS Queen Elizabeth Hospital Birmingham. Working closely with the client and the building end users, Astwoods provide certificates of conformity for each door installation in line with the requirements of BS 8214: 2016.

Worcestershire Acute
NHS Trust

Project: Fire Door Replacements 2024-26

Location: Kidderminster

Working closely with the Trust’s Estates team Astwoods survey existing fire doors and propose upgrades and additional features to improve the suitability of the fire doors for each location. This has included additional protection to fire doors. Work is typically undertaken outside of working hours and completed in one visit to minimise disruption.

Sandwell
College

Project: Fire Door and Fire Stopping

Location: West Bromwich

Astwoods were appointed by Sandwell College to complete an inspection of all fire doors throughout their main college building. Following the inspection Astwoods were appointed to complete the required maintenance works throughout the building. Works have been undertaken out of ours and during half term and holiday periods to eliminate any disruption to the college personnel and students.

University Hospital Coventry
& Warwickshire

Project: Fire Door Automation

Location: Coventry

Automation is being considered across numerous buildings as the technology advances in this area. Healthcare is an area where automation is particular useful is assisting access for service users. Astwoods have been undertaking a large scale installation of automation throughout the UHCW Acute Hospital in Coventry, working in partnership with specialist manufacturers and installers to commission the newly installed fire doors.

Queen Elizabeth
Hospital 

Project: Out of Hours Fire Door Replacements 

Location: Birmingham

A large scale programme of specialist Fire Door replacements across the UHB sites, often in sensitive areas including A&E, Imaging and high dependency units where bespoke methods of working and an Out of Hours installation is required in order to meet the building user’s needs. Astwoods works with various stakeholders to ensure a smooth process to complete works within the timescales specified by the client with minimum disruption.

Birmingham & Solihull Mental Health NHS Foundation Trust

Project: Fire Door Replacements

Location: Birmingham

Undertaking a programme of Fire Door replacements and repair works taking place within a secure unit. Astwoods liaise with stakeholders and ward personnel to create a programme of works to minimise disruption with this extremely sensitive environment, often coordinating with other trades to complete works from start to finish in one visit.

Allens Croft
Children’s Centre 

Project: Fire Door Replacements

Client: Birmingham City Council 

Location: Kings Heath, Birmingham

Astwoods has undertaken a programme of Fire Door replacements within a community facility. Liaising with stakeholders in order to carry out works within this sensitive environment, completing installations at the convenience of the building users, and with as little disruption as possible.

Hospital of St Cross
Rugby

Project: Fire Door Inspections

Client: Rugby Hospital of St Cross

Location: Rugby, Warwickshire

Astwoods have completed the survey and inspection of over 400 doors throughout the large and varied Hospital of St Cross healthcare facility. The inspection details repairs required throughout the doors and buildings surveyed assisting the client meet their duties under the Regulatory Reform Act.

Wolverhampton
Homes

Project: Fire Door Replacements & Passive Fire Upgrades

Client: Wolverhampton Homes  

Location: Wolverhampton, West Midlands

Astwoods since 2021 have been working in partnership with Wolverhampton Homes alongside other appointed specialist contractors in the improvement of passive fire protection across numerous areas of the city. The works have included replacement fire doors, new partitions, fire stopping and other planned maintenance improvements. Working in occupied properties maintaining high levels of customer satisfaction and generating significant levels of added social value.