CALL 01527 407001

CARPENTRY & FIT OUT

Case Studies

Below are some recent projects that we have undertaken.

103 Colmore Row

Project: Fire Door Installation, Carpentry & Joinery Fit Out

Location: Central Birmingham

Astwoods completed the installation and certification of over 900 fire doors on 30 floors within this landmark Grade A office development in central Birmingham. Working closely with the design team and door manufacturers to develop a compliant system throughout the building.  The works also included all associated fire-stopping and general carpentry and joinery throughout the landmark commercial property.

Masterchef

Works: Carpentry & Joinery Fit Out

Location: Central Birmingham

Astwoods completed high specification carpentry and fire door fit out to the new Masterchef Studios in Central Birmingham. Working with the Principal Contractor and then the building occupiers the building was completed to the highest specification utilising local supply chain and local labour. Astwoods are delighted to have the quality of our works showcased on national TV.

Higham Lane North Academy

Works: Carpentry & Joinery Fit Out

Location: Nuneaton, Warwickshire

Astwoods worked on their 16th major new build school project over recent years with the carpentry and joinery fit out of Higham Lane North Academy. The works included installing 192 doors with all fire doors being certificated with IFC certification, skirting board, window board, stair strings and reception desks. During the works Astwoods were delighted with our health and safety performance with Astwoods’ supervisor receiving ‘black hat’ of the month award for his dedication to H&S management for his team and others on site.

Studley Castle
Hotel

Works: Carpentry, Joinery & Bespoke Renovation

Location: Studley, Warwickshire

Astwoods completed the comprehensive renovation of Studley Castle's signature entertainment area. Grade II listed and working in close cooperation with the Conservation Officer, Architect and Structural Engineer to complete the following: removal of defective & damaged materials, temporary supports, reinstatement of ceiling & floor timbers, reinstatement of lime plaster, replacement of ornate coving & plasterwork, full redecoration, carpeting and setting out of furniture.​

Nuneaton
New Market Hall

Works: Bespoke Carpentry to Roof Structure

Location: Nuneaton, Warwickshire

The development of the Abbey Street Area of Nuneaton is creating a vibrant collection of buildings which include a new Market Hall. The design incorporates open eaves with large timber sections which Astwoods supplied from our specialist timber merchants installed by our time-served carpenters to achieve the effect the architect had envisioned in their sketches.

Paradise View – Luxury Studio Apartment

Works: Carpentry and Fire Door Fit Out

Location: Central Birmingham

Astwoods are undertook the Carpentry package and Fire Door Installations in the conversion of this local landmark building. Formerly a mixed-use commercial tower in central Birmingham, the Astwoods team is part of the workforce bringing it back into use as residential accommodation. Works include door installations, architrave, window boards, skirting boards, and communal area fit outs, throughout.

Hampton
by Hilton

Works:  Carpentry and Fire Door Fit Out

Location: Warwickshire

Astwoods undertook the fire door installation and carpentry & joinery fit-out for the new-build 78-storey Hampton by Hilton in Nuneaton, Warwickshire. Working in close collaboration with our door supplier the doors were installed providing IFC Certification. The high specification finish required was achieved with Astwoods experienced team led by our Supervisors and Contracts Managers to exceed the client’s expectations.

Rugby Free Secondary School and Quest Academy

Works: Carpentry and Fire Door Fit Out

Location: Rugby, Warwickshire

Across 2 adjacent schools, Astwoods undertook the fire door installation and carpentry fit out works leading to being awarded numerous new school projects. With approaching 300 doors installed across the 2 school buildings the works also encompassed bespoke works to sports halls and reception areas.

Hill West
Academy

Works: General Carpentry and Fire Door Fit Out

Location: Sutton Coldfield, Birmingham

Astwoods are delighted to be delivering another New-Build school in the West Midlands, with the construction of the new Hill West Academy. Astwoods are demonstrating their commitment to social value on the project by offering work placements for young persons, which are proving very popular with our team, our client and the young people given an opportunity on this scheme.